Kaneland CUSD 302 - 2025 Cooling Equipment Replacement
John Shields ES - 85 S. Main St., Sugar Grove, IL 60554; Harter MS - 1601 Esker Dr., Sugar Grove, IL 60554
This project includes: Replacement of split-system DX cooling equipment serving an MDF Room at John Shields ES and the walk-in cooler at Harter MS. Equipment replacement includes both the evaporator and condenser sections of the equipment and connected refrigerant piping, as well as reconnection of all power/control wiring and devices.