Kaneland CUSD 302 - 2025 Cooling Equipment Replacement
This project includes: Replacement of split-system DX cooling equipment serving an MDF Room at John Shields ES and the walk-in cooler at Harter MS. Equipment replacement includes both the evaporator and condenser sections of the equipment and connected refrigerant piping, as well as reconnection of all power/control wiring and devices.
Status
Bidding Closed
Bid Date | 6/18/25 2:00pm |
Location
John Shields ES - 85 S. Main St., Sugar Grove, IL 60554; Harter MS - 1601 Esker Dr., Sugar Grove, IL 60554
BID DUE DATE:
Wednesday, June 18, 2025 - 2:00PM
Kaneland CUSD 302 - District Office
47W236 Keslinger Rd., Maple Park, IL 60151
Complete Downloads are available at no cost to bidders
Bidders must REGISTER and LOG-IN to download files