Kaneland CUSD 302 - 2025 Cooling Equipment Replacement

This project includes: Replacement of split-system DX cooling equipment serving an MDF Room at John Shields ES and the walk-in cooler at Harter MS. Equipment replacement includes both the evaporator and condenser sections of the equipment and connected refrigerant piping, as well as reconnection of all power/control wiring and devices.
Plans (click to expand/collapse)
Name Size
Complete Plan Set 280.5 KB