Kaneland CUSD 302 - 2025 Cooling Equipment Replacement
This project includes: Replacement of split-system DX cooling equipment serving an MDF Room at John Shields ES and the walk-in cooler at Harter MS. Equipment replacement includes both the evaporator and condenser sections of the equipment and connected refrigerant piping, as well as reconnection of all power/control wiring and devices.
Project Manual
(click to expand/collapse)

Name | Size | ||
Project Manual | 2.6 MB |